Installation & Construction Of 01 No Tbs (50 Mcf/Hr) At Chak No 42/2-L, 36/2-L, 39&40/2-L, 33&34/4-L District Okara, 67/Eb And 02 No Tbss At 163/Eb District Pakpattanĭitching And Backfilling Against Laying Of 12"Dia X6.5km External Network & 6"Dia X 7.5 Km Internal Network Supply Main For Provision Of Gas Supply On Rlng Basis To M/S Jalozai Housing Scheme Cherat Road Nowsheraĭitching And Backfilling Against Laying Of 16" Dia X 0.75 Supply Main For Sms Regi Model Town To Connect Network For Hayatabad Industrial Estate Peshawar ![]() 50 Kva Diesel & Gas (Dual Function) Genset For Muridkey Sub Office On Monthly Rental Basis. Installation Of 2 Mm Fiber Shed 70'X29' On Already Fixed M/S Pipe Structure In Sngpl Pipe Dopeyard, Mouza Piran Ghaiab Adjacent Ogdcl Office, Nobahar Canal Road, Multan. Material Safety Data Sheet (Methane Gas).The Pride (SNGPL"s Monthly News Letter).National Gas Allocation & Management Policy. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |